greek   uk
Un-plastered reinforced concrete school building Two span steel trusses with a total length of 72 m in warehouse building Temporary retaining system of the excavation with a total depth of 10 m Retaining system of the excavation under-the-water-table Strengthening of the bearing structure Assesment of the bearing capacity of the roof trusses and calculation of the vertical loads of the bearing masonry Temporary retaining system of the excavation in sandy soil Steel industrial building with composite slabs Retaining system of torrent slopes with a total length of 130 m Un-plastered concrete school building

Site supervision

In the vast majority of projects, the owner requires and therefore our office engages to, the supervision of the implementation of our designs in-site. Calls to the site are frequent, sometimes daily, and written reports and complete photograph documentation are provided to the client.

Construction project management
In cases of medium scale, private, residential or office buildings, our office, in addition of the site supervision, engages to the project management and the administration of the cash-flow.



ESPA
   
     



   






EPILYSI © 2013 | All rights reserved | Powered by Webdesign365Webdesign365.gr